our major projects

Pars Petrochemical Port

Contract: EPC
Technical Data: 2,700m two arms of breakwater Up to 35m water depth, Fifteen posts of various types of wharf including LNG and LPG

POGC LNG export port

Contract: EPC
Technical Data: The project includes the dredging of basin, reclamation of new land for construction sulfur berth, construction of two LPG berths and breakwater with 4,657m long.

SPGS LPG export berths

Contract: EPC
Technical Data: 940 m of breakwaters, Construction of 2,600 m dike for land reclamation. Two posts of LNG and LPG jetties

NGL 1300

Contract: EP + Pre-commissioning + Commissioning
Technical Data: 180 MMSCFD of Feed Gas, 4,400 BBIS/D of Feed Condensate

Pars Service Port

Contract: EPC
Technical Data: Engineering, Procurement and Construction of Pars Service Port...

Commercial port of Kish Island

Contract: EPC
Technical Data:
Procurement and Construction of Kish Port Complex development including: Dredging & Reclamation about 700,000 m3.

SRB Commercial Port

Contract: EPC
Technical Data:
Engineering, Procurement and Construction of 2nd phase of SRB Port Complex Development. Dredging & Land Reclamation with Total Volume about 8,000,000 m3 in one Phase...

Al-Fajer Water Supply Project

Contract: EPC
Technical Data: Capacity : 2000 m3/hr
Design, Procurement and Construction of Water Intake, Treatment Plant, Pump Stations and 17 Km Ductile Iron Pipeline up to 700 mm Dia

FAJR Water Treatment Block I

Contract: EPC
Technical Data:
Clarified Water: 7000 m3/hr, DM Water: 980 m3/hr, CPP: 555 m3/hr, Service Water: 400 m3/hr, Potable Water: 250 m 3/hr, RO Water: 3900 m3/hr, Firefighting Water: 7000 m3/hr, Cooling Water: 2400 m3/hr,

FAJR Water Treatment Block II

Contract: EPC
Technical Data: RO Water: 5460 m3/hr
Potable Water: 125 m3/hr
Cooling Water: 9000 m3/hr
DM Water: 1470 m3/hr
CPP: 400 m3/hr

Darquain Water Supply for ENI, Italy

Contract: EPC
Technical Data:
Treated Water: 200 m3/hr
Intake from River
17 Km pipeline(HDPE)
Conventional Water Treatment
Reservoir 2500 m3(C.S)

IKA Airport Wastewater Treatment Plant

Contract: EPC
Technical Data:
Treated Water: 2000 m3/day
Conventional activated sludge (extended aeration)
Tertiary treatment
Processed effluent for drip irrigation